Resources
Evaluate solar ERP with one real project.
A feature list is useful, but a complete workflow reveals whether a system fits the way your team works.
Beliance Web · Buying guide · Reviewed 31 October 2026
Choose a recent project and trace it from the first enquiry to final collection. Ask each software provider to show how the same record moves through sales, technical review, materials and field delivery. Record every step that still needs a spreadsheet or manual message.
Prepare the evaluation project
Remove the real customer’s personal details before sharing a scenario with vendors. Keep the information needed to test the workflow: project type, location, approximate capacity, survey notes, selected equipment, quotation changes, material demand, installation status and payment milestones.
1. Check the sales handoff
Create an enquiry and assign a named owner. Add the next follow-up and a site survey. Then ask whether the salesperson and surveyor can both see the relevant information without copying it into another system. A CRM that records only contact details may leave the technical handoff unresolved.
2. Check the quotation output
Build a quotation from the survey assumptions. Review equipment, exclusions, tax treatment and approval responsibilities. Download the actual A4 PDF and compare it with the browser preview, especially if a company profile master controls logo or watermark positioning. The final exported document is what the customer receives.
3. Check material readiness
Look at physical stock and the project’s material requirement separately. Ask who can request, approve, dispatch and receive an item. If a branch has its own warehouse, test how head office and branch staff see that movement. Do not assume that an item balance alone proves an installation is ready.
4. Check delivery and collections
Move the sample job through its installation stages. Record a delay and identify who owns the next action. Then enter a partial customer payment and check what the accounts team sees. Define which documents and approvals your company requires before a job is complete.
5. Test access with ordinary users
Sign in as a branch employee, field worker and accounts user. Try list views, direct links and exports for a record outside each role’s scope. Verify server behavior, not just hidden buttons. Ask how roles change and how a departed employee’s access is removed.
Make the decision on total fit
Compare the number of branches and users supported, current plan duration, full payable amount including GST, migration scope, support commitments and data export process. Put uncertain items in a question list. A short pilot on active work is more useful than a generic dashboard demo.
SolarOps includes survey, follow-up, quotation, stock demand, installation tracking, payments and branch management areas visible in the application. Their exact scope depends on configuration and plan. See the Solar ERP guide and use the checklist above during a walkthrough.